The Tenure of load shedding has been reduced to 12 hours by PESCO on the 75 high-lose feeders to provide relief to the customers in the hot weather.
The high-lose feeders include 13 feeders of Peshawar Circle, 18 of Khyber, 27 of DI Khan, 13 of Bannu, three of Mardan, and one feeder of Swabi.
However, the PESCO made it clear that an operation against the power thieves will be carried out in the next 15 days and the relief in load shedding tenure will only continue after a decline in losses.
PESCO Grid Station Shuts Down A Day After Violent Protest
It is to be noted that KP ministers have been storming PESCO and other grid stations in the province over ‘excessive’ load shedding, while the Ministry of Power has been citing less recovery behind the increasing power cuts.
On June 20, Minister for Information and Broadcasting Atta Tarar took a jibe at Khyber Pakhtunkhwa (KP) Chief Minister (CM) Ali Amin Gandapur for ‘storming’ grid station in Dera Ismail Khan.
Addressing a presser in Islamabad, the minister said that if the chief minister could take 100 people to the grid station, he could take 1000 there.
Atta Tarar said that the issues of electricity and line losses should be resolved by the center and the provinces together, with mutual understanding and cooperation.
Mutib Khalid is a skilled content writer and digital marketer with a knack for crafting compelling narratives and optimizing digital strategies. Excel in creating engaging content that drives results and enhances online presence. Passionate about blending creativity with data-driven approaches, Mutib Khalid helps brands connect with their audience and achieve their goals.