Gas Supply Disruption in Karachi Rawalpindi
In a statement, the company announced that the gas supply will remain suspended for eight hours near Peoples Chowrangi Karachi due to the relocation work of a 12-inch diameter high-pressure gas pipeline.
SSGC said that in the wake of the Bus Rapid Transit (BRT) project, the pipeline line will be relocated on December 14.
“During the replacement work, the gas supply will be shut off from 10:00 pm on December 14 till 6:00 am on December 15”, it said.
SNGPL reveals new gas supply schedule for winter season
As per the SSGS, the gas supply to Agha Khan Hospital, Liaquat National Hospital, and Saylani Welfare Trust will remain affected, however, the supply to households during the said timings already remains shut off for profiling.
On the other hand, Rawalpindi is facing a severe gas crisis, with supply disruptions reported in 70% of the city’s areas as the mercury has dropped.
As per details, residents of Chaklala Scheme III, Gulistan Colony, Wilayat Homes, Edgar Mohalla, Jamia Masjid Road, Dhoke Hassu, Dhoke Kashmirian, Sadiqabad Khurram Colony, Rawalpindi Cantonment, Khayaban-e-Sir Syed, and Dhoke Kala Khan are unable to prepare meals due to the lack of gas supply.
The crisis has also forced the closure of tandoors in many neighborhoods as the people are struggling to manage their daily needs.
The gas crisis has distressed parents especially, as they are sending their children to school without breakfast.
Mutib Khalid is a skilled content writer and digital marketer with a knack for crafting compelling narratives and optimizing digital strategies. Excel in creating engaging content that drives results and enhances online presence. Passionate about blending creativity with data-driven approaches, Mutib Khalid helps brands connect with their audience and achieve their goals.