OGDCL Restores Oil Production After 4.5 Years Extracting 1,000 BPD
OGDCL has informed that the oil production has been restored at the site, with current extraction rates reaching approximately 1,000 barrels of crude oil per day ending a 4.5-year hiatus in operations.
The oil production from the well was suspended in 2020 owing to technical faults.
The revival of these wells was made possible through the implementation of advanced artificial lift technology, according to company officials. OGDCL completed the installation of electric pumps at the site, enabling extraction operations to reach depths of 3,774 meters.
The company highlighted that it maintains 100% ownership of the wells, positioning this development as a key achievement for Pakistan’s domestic energy production capabilities.
Mutib Khalid is a skilled content writer and digital marketer with a knack for crafting compelling narratives and optimizing digital strategies. Excel in creating engaging content that drives results and enhances online presence. Passionate about blending creativity with data-driven approaches, Mutib Khalid helps brands connect with their audience and achieve their goals.