SSGC Restores Gas Supply Ahead of Schedule After 31-Hour Outage in Karachi
According to Sui Southern Gas Company (SSGC) spokesperson, gas supply to all sectors has commenced from 5 AM.
Connecting the 31-kilometer, 24-inch diameter pipeline was completed earlier than expected. The SSGC team successfully integrated the pipeline into the system before the scheduled time.
The Managing Director of Sui Southern praised the technical team for their prompt project completion, recognizing their efforts with commendation.
The MD SSGC has also extended an apology to the consumers who faced hardships during the upgradation work
New gas reserves discovered in Sindh
It is to be noted that the gas supply was suspended in half of Karachi for 24 hours on Sunday.
The citizens technically faced gas load shedding for 31 hours as the SSGC suspended the supply of gas at 10 pm daily.
According to Sui Southern spokesperson, the shutdown affected both domestic and industrial consumers.
Surjani Town, Manghopir, Qasba Town, Orange, North Karachi, North Nazimabad, FB Area, Gulberg, Buffer Zone, Site Industrial Area, Baldia, Ittehad Town, Kemari, Gulshan-e-Iqbal, Ahsanabad, Janjal Goth, and surrounding areas of Super Highway faced gas load shedding
Mutib Khalid is a skilled content writer and digital marketer with a knack for crafting compelling narratives and optimizing digital strategies. Excel in creating engaging content that drives results and enhances online presence. Passionate about blending creativity with data-driven approaches, Mutib Khalid helps brands connect with their audience and achieve their goals.